April 27, 2025
With a tight project schedule, the manufacturer delivered on time, and on-site technical personnel provided guidance throughout the entire installation and commissioning process; the collaboration was highly efficient and hassle-free.
When you need reliable power distribution for critical infrastructure, the S22 type 20kV power transformer from Lijie Electric delivers industry-leading performance. Manufactured at our 500,000 square meter facilities by a team of over 160 specialized engineers, this transformer achieves GB 20052 Level 1 Energy Efficiency with no-load losses 40% lower than S11 models and 20% below S13 standards. Our capacity range spans 30-2500kVA, featuring ONAN oil-immersed self-cooling and Dyn11 connection groups. With production cycles of 6-30 days and certifications including ISO 9001:2015, CE, UL, and IEC compliance, we serve power grids across 15+ countries with proven reliability.

You're looking for more than just equipment. You need a partner who understands power infrastructure challenges.
Our transformers feature fully sealed construction that eliminates maintenance headaches. You won't need to worry about oil leaks or environmental contamination. The off-grid voltage regulation system ensures your operations stay safe during adjustment procedures.
Energy savings translate directly to your bottom line. With load losses 10-15% lower than national standards, this transformer pays for itself through reduced electricity costs. Many facilities see noticeable reductions in monthly power expenses within the first year.
The near-elliptical coil design with integral assembly provides exceptional short-circuit resistance. Your transformer keeps running even under sudden electrical stress. We've engineered uniform axial clamping force throughout the coil structure, so you get consistent performance year after year.
Here's what you get with each unit:
| Parameter | Specification |
|---|---|
| Energy Efficiency Rating | Level 1 (GB 20052) |
| Voltage Rating | 20kV / 0.4kV |
| Capacity Range | 30-2500kVA |
| Frequency | 50Hz / 60Hz |
| Number of Phases | Three-phase |
| Connection Group | Dyn11 (preferred), Yyn0 |
| Voltage Regulation | No-load tap changer |
| Tap Range | ±2×2.5% or ±5% |
| Cooling Method | ONAN (Oil Natural Air Natural) |
| Insulation Level | Power frequency 35kV AC / Impulse 75kV |
| No-load Loss | 40% lower than S11 / 20% lower than S13 |
| Load Loss | 10-15% below national standard |
| Operating Temperature | Max 40℃ outdoor (customizable) |
| Noise Level | ~20% lower than JB/T 10088 standard |

Quiet Operation: The stepped iron core joint combined with premium silicon steel sheets reduces noise by approximately 20%. Your neighbors and workers will appreciate the difference.
Maintenance-Free Design: The fully sealed structure means you save on inspection costs and labor. No oil changes, no routine maintenance schedules to manage.
Flexible Installation: Whether you need indoor or outdoor units, we provide standardized designs. Special requirements? We customize solutions to match your specific site conditions.
Fast Delivery: Production cycles run 6-30 days depending on specifications. You won't experience lengthy delays that set back project timelines.
Global Standards Compliance: Your S22 type 20kV power transformer arrives with all necessary documentation—test reports, drawings, operation manuals, and certification papers for local regulatory approval.
You'll find our transformers powering critical infrastructure worldwide:
Our global sales network extends across Australia, New Zealand, India, Vietnam, Malaysia, Indonesia, Kazakhstan, Egypt, Kenya, and beyond. Wherever your project location, we provide installation guidance and comprehensive after-sales support.
Lijie Electric operates two major R&D and manufacturing bases in Xuzhou and Nantong, China. With over 2,000 employees and annual sales exceeding 5 billion RMB, we're not a small workshop—we're an established manufacturer with proven capabilities.
Every transformer passes rigorous testing by the National Transformer Quality Supervision and Inspection Center and Wuhan High Voltage Research Institute. We don't cut corners on quality control.
Our semi-oil channel insulation system with prefabricated components delivers high heat resistance and low partial discharge. These engineering details matter when you need equipment that operates flawlessly for decades.

What makes the S22 series more efficient than older models?
The product uses advanced core materials and optimized winding techniques. This combination dramatically reduces both no-load and load losses compared to S11 and S13 predecessors.
Can you customize specifications for unusual requirements?
Absolutely. While we offer standardized designs, our engineering team regularly adapts transformers for unique voltage requirements, environmental conditions, or space constraints. Share your specifications and we'll develop a solution.
How long does typical installation take?
Most installations complete within 1-2 days once the transformer arrives on site. We provide detailed installation guidance and technical support throughout the process.
What documentation comes with each unit?
You receive complete technical drawings, operation manuals, factory test reports, and all relevant certification documents needed for regulatory approval in your region.
Do you provide spare parts?
Yes. We maintain inventory of critical components and ship replacement parts globally. Our after-sales team assists with any technical issues that arise.
Is training available for maintenance staff?
While the fully sealed design requires minimal maintenance, we offer technical training for your team covering operation procedures, troubleshooting, and safety protocols.
Ready to upgrade your power infrastructure with S22 type 20kV power transformer? Reach out to our team at lijieelectrical@gmail.com for detailed quotes and technical consultation.
YOU MAY LIKE
April 27, 2025
With a tight project schedule, the manufacturer delivered on time, and on-site technical personnel provided guidance throughout the entire installation and commissioning process; the collaboration was highly efficient and hassle-free.
July 2, 2025
During the preliminary phase, a selection plan was custom-tailored based on the actual site load requirements, resulting in a high degree of parameter compatibility. After-sales support responds within two hours, and ongoing technical support for operation and maintenance is comprehensive; we feel completely confident in a long-term partnership.
November 18, 2025
Deployed as a supporting component for a 35kV grid-connection project at a photovoltaic power station, the equipment operates for an average of 16 hours daily. It demonstrates excellent control over no-load losses, ensures smooth power generation and grid integration, and effectively reduces the station's overall energy consumption.
January 30, 2026
Under the continuous, high-load operating conditions of a factory production line, the equipment maintains stable electrical parameters and exhibits strong overload resistance, thereby guaranteeing an uninterrupted power supply for industrial production.
April 3, 2026
Integrated as a supporting component for a new energy photovoltaic grid-connection system, the manufacturer provided professional technical coordination and timely after-sales support, ensuring seamless adaptation to the specific electrical operating conditions required for grid integration.